Skip to content

docs(issues): [#2583] record that EPIC #1488 is closed in the publish spec - #2990

Merged
josecelano merged 9 commits into
torrust:developfrom
josecelano-bot:2583-record-1488-closed
Nov 22, 2026
Merged

josecelano merged 9 commits into
torrust:developfrom
josecelano-bot:2583-record-1488-closed

Conversation

@josecelano-bot

@josecelano-bot josecelano-bot commented Nov 21, 2026 •

Copy link
Copy Markdown
Contributor

Summary

Spec-only sync. EPIC #1488 (shutdown overhaul) closed on 2026-11-19 08:07 UTC with its close-out PR #2951, but the first-publish spec (#2583) and the #1669 EPIC spec on develop still described it as pending. This PR records that prerequisite 3 of #2583 is met.

No crate's status changes. #2583 and #2594 stay Blocked: prerequisite 5 (the rest of EPIC #1669's API work), the per-crate testing gates, #2917 before configuration 4.0.0, and the open questions OQ1, OQ3 and OQ4 remain. No open question is answered here.

Changes

docs/issues/open/2583-1669-first-publish-of-workspace-crates/ISSUE.md:

  • The "Other prerequisites" decision row, prerequisite 3, T3, the workflow checkpoint and AC7 say Overhaul: Tracker Shutdown #1488 is closed (T3 and both checkboxes stay open because of the other gates).
  • New section "EPIC Overhaul: Tracker Shutdown #1488 closed": what the EPIC changed that matters for publishing (SI-18 and SI-19 removed the legacy Halted shutdown API, torrust-server-lib 0.5.0 then 0.6.0; SI-25 removed nine unused public error variants from the HTTP, REST and UDP server crates with no version bump; SI-20 added a public field to Configuration and SI-21 added Readiness to primitives; SI-26 changed the public API of the root crate only, not of a checklist crate; SI-28 added app::run_until_shutdown_signal to the root crate and the test-only, publish = false crate torrust-tracker-hung-component-tracker).
  • OQ2 (whether the Overhaul: Tracker Shutdown #1488 prerequisite becomes per crate) is marked moot, not decided and not deleted.
  • The pre-publish notes of rows 14, 17, 18 and 20 no longer say Reorganize test support code shared between workspace packages (EPIC #1669) #2482 "may change" the crate, and rows 17, 18 and 20 no longer say it of Overhaul: Tracker Shutdown #1488; those three name the SI-25 variant removal for the first-publish release notes.
  • The primitives state line, the "Stale order" and "Publishing spread over time" risks and one scope bullet no longer treat Overhaul: Tracker Shutdown #1488 as pending.
  • The stale-facts note (T4 owns the update) gained the 2026-11-21 member count: 36 members, 14 with publish = false, still 22 publishable.
  • Progress-log entry.

docs/issues/open/1669-overhaul-packages/EPIC.md: the #2583 quick-list line and subissue-table row no longer say "blocked on #1488"; progress-log entry. Earlier log entries are history and are unchanged.

Not changed: the #2594 spec and DECISIONS.md do not mention #1488.

Validation

  • Every fact was checked on GitHub (issue and PR states and dates) and on develop (cargo metadata --no-deps, the crates' Cargo.toml, the archived specs of the EPIC Overhaul: Tracker Shutdown #1488 sub-issues) on 2026-11-21.
  • ./contrib/dev-tools/git/hooks/pre-commit.sh passed (includes linter all).

Related to #2583
Related to #1669

🤖 Generated with Claude Code

…in the publish spec

EPIC torrust#1488 (shutdown overhaul) closed on 2026-11-19, so prerequisite 3 of
the first publish is met. The spec says so where it described the EPIC as
pending, lists what the EPIC changed for publishing, and marks open
question OQ2 moot without deciding it. The torrust#1669 EPIC spec no longer
describes torrust#2583 as waiting on torrust#1488.

Spec-only change. No crate's status changed: torrust#2583 and torrust#2594 stay blocked
on the other prerequisites.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
@josecelano josecelano self-assigned this Nov 21, 2026
@josecelano
josecelano requested review from da2ce7 and a balanced review from Copilot November 21, 2026 14:55

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Warning

Copilot couldn't run its full agentic review because it didn't start before the timeout. Make sure your repository has a runner available, or add a copilot-code-review.yml file specifying one with the runs-on attribute. See the docs for more details.

Copilot review overview

3 open issues
What changed in this PR

Updates the #2583 first-publish spec and the #1669 EPIC spec to reflect that EPIC #1488 (shutdown overhaul) has been closed, and to document the publishing-relevant impacts of that closure.

Changes:

  • Record EPIC #1488 as closed across prerequisites/checkpoints, with a new section summarizing publish-relevant API/behavior changes.
  • Mark OQ2 as moot (not decided) and update multiple checklist/risk notes to remove “pending #1488” phrasing.
  • Update #1669 references to #2583 to remove “blocked on #1488” wording and add a progress-log entry.
File Description
docs/​issues/​open/​2583-1669-first-publish-of-workspace-crates/​ISSUE.md Records EPIC #1488 closure, adds an “EPIC #1488 closed” summary section, and updates prerequisites/checklist/risk notes accordingly.
docs/​issues/​open/​1669-overhaul-packages/​EPIC.md Updates #2583’s blocker wording to reflect #1488 is done and logs the sync event.

Review effort: Lite

josecelano-bot and others added 2 commits November 21, 2026 15:15
…clause from OQ2

Review of PR 2990 (finding F1): the OQ2 row said EPIC torrust#1488 is expected to close soon next to the note that it closed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
…its met state in the decision row

Review of PR 2990 (finding F2): the row mixed tenses in one clause.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
da2ce7
da2ce7 previously approved these changes Nov 21, 2026

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 258ebd01eda932b088cbc9f37b2dc00de9f71928. Recomputed from the bytes at this head, against the merge base 4be22ee66; git merge-tree against develop 4be22ee66 merges without conflict and writes exactly the head's tree.

Process: a spec-only update of an open issue spec and its EPIC, governed by create-issue (progress log naming the agent, last-updated-utc, status values), write-markdown-docs, commit-changes and open-pull-request (Related to, the commit-id check). Both files bump last-updated-utc and gain a progress-log entry; every status stays BLOCKED.

The change against its claim: each edit the description lists is in the diff, and nothing else is. Recomputed: 36 workspace members, 14 with publish = false, 22 publishable; torrust-server-lib went from 0.4.0 to 0.5.0 (PR #2793) and then to 0.6.0 (PR #2807); PR #2858 removed exactly nine variants, three per enum, and the archived SI-25 log records the no-bump decision; app::run_until_shutdown_signal and packages/hung-component-tracker (publish = false) came in with PR #2911; PR #2951 merged on 2026-11-19, with #2960 and #2967 after it. SI-20, SI-23 and the #2482 gating issues did change the testing modules of the three server crates, so rows 17, 18 and 20 hold. The 08:07 UTC close time cannot be recomputed offline. Two statements in the new section are wrong as written (F1, F2).

Consistency: both #epic-1488-closed links resolve to the new heading; relative links are unchanged; every table row's cell count matches its header; no live text still describes the first publish as waiting on #1488; the #2594 folder and DECISIONS.md do not mention it. No dictionary change.

Hygiene: one commit, a Conventional subject in the repository's [#N] form, a body that matches the diff, author equals committer, one attribution footer line (no rule in the tree on it); the description carries one attribution footer line too. git diff --check is clean, the skill's commit-id check prints nothing, and the closing-keyword pattern matches neither the title, the description nor the commit.

Findings: F1 (Minor), F2 (Minor), F3 (Nit). None of them blocks.

Checked, no finding: OQ2 is kept and marked moot, not decided; T3 and both checkboxes stay open; the stale-facts sentence that hung-component-tracker was added since 2026-10-20 is accurate (it was already in the 2026-11-18 count; the member added since then is agent-reply-validator).

Checks

On the loop's compute node at this head, against the merge base 4be22ee66 (receipt server-gates-kranich-1301): the repository's pre-commit gate and lint roster exit 0 (133 s wall). This pull request has no review threads, so there is no audit record for the validator to check. The PR changes documentation only, so no package tests apply. Checked against the bytes at posting: docs/issues/open/2583-1669-first-publish-of-workspace-crates/ISSUE.md:135 says SI-26 consolidated the shutdown supervisors "without changing a public API", while the merge of PR #2870 (1c3daab4b) removes the public register_legacy and legacy_cancellation_token methods, renames start_ban_cleanup_job to run_ban_cleanup_job and adds pub mod token_aware_server in the root crate, as F2 says. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 4be22ee66.

@da2ce7

da2ce7 commented Nov 21, 2026

Copy link
Copy Markdown
Contributor

ACK 258ebd0 — prerequisite 3, the moot OQ2, the 36/14/22 member count and the SI-18, SI-19, SI-25 and SI-28 facts recomputed from the tree at this head

josecelano-bot and others added 4 commits November 21, 2026 15:16
…ust#2482 and torrust#1488 could change

Review of PR 2990 (finding F3): the scope bullet mixed tenses; the Stale order risk had the same construction.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
…figuration and primitives crates

Review of PR 2990 (finding F4): the new section read as a complete list but left out SI-20 and SI-21, which changed the public API of two published checklist crates.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
…c API, not a checklist crate's

Review of PR 2990 (finding F5).

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
…blish note of row 14

Review of PR 2990 (finding F6).

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
josecelano-bot and others added 2 commits November 21, 2026 15:24
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 5f10e4996176f5e39cf79003c26e722d596d5e9a. Recomputed from the bytes at this head, against the merge base 4be22ee66; git merge-tree against develop 4be22ee66 merges without conflict and writes exactly the head's tree.

Process: since 258ebd01e, eight commits: six one-per-finding fixes to ISSUE.md, a progress-log entry (d3877fd13) and the audit record (5f10e4996), as process-pr-review and create-issue require.

The change against its claim: each commit does what its subject says. The new SI-20 and SI-21 bullet matches the tree (Configuration is exhaustive with all-public fields; application, shutdown and primitives::Readiness are public), and the SI-26 bullet is scoped to checklist crates, which is right because its merge touches only src/. Row 14 (line 337) now reads "#2482, which could change its Mock* types, is closed.", so the description's row-14 claim and the reply on that thread hold. last-updated-utc is 2026-11-21 15:24, matching the new log entry (line 491) and its commit time.

Audit record: six rows, one per thread: three from the automated reviewer's review, then my three, renumbered F4 to F6 with my IDs kept as "Reviewer finding ID". Each source thread exists and is resolved, each reply URL is a reply on its own thread, and the source review IDs and severities match. The validator's logic, run offline with the captured comments and the branch commits as the PR's commit list, reports 6 rows, 2 log entries and 0 failures. Every resolution reference is a commit subject on the branch. No thread appeared after the record.

Consistency: table rows keep their cell counts, the #epic-1488-closed links resolve, and the record follows the template's sections. The only commit id the changed files cite is on develop.

Hygiene: author equals committer on every commit, each carries one attribution footer line (no rule in the tree on it), and the description carries one too. git diff --check is clean, the skill's commit-id check prints nothing, and the closing-keyword pattern matches neither the title, the description, any commit nor the record.

Findings: none open. F1 and F2 were fixed in the earlier push, and F3 by the row-14 commit; the round-2 draft's F4 (no record), F5 (row-14 claim ahead of the branch) and F6 (stale last-updated-utc) are fixed at this head.

Checked, no finding: the record's first log entry puts the replies (15:22Z) before its own 15:23 stamp, so the late start is on record.

Checks

On the loop's compute node at this head, against the merge base 4be22ee66 (receipt server-gates-kranich-1310): the repository's pre-commit gate and lint roster exit 0 (116 s wall), and the audit validator passes on this PR's record (6 rows, 2 log entries, 0 failures). The PR changes documentation only, so no package tests apply. Checked against the bytes at posting: row 14 of docs/issues/open/2583-1669-first-publish-of-workspace-crates/ISSUE.md (line 337) now says #2482 is closed, and last-updated-utc (line 12) is 2026-11-21 15:24, as the review says F3 and F6 are fixed. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "". At posting, develop is 4be22ee66.

@da2ce7

da2ce7 commented Nov 21, 2026

Copy link
Copy Markdown
Contributor

ACK 5f10e49 — F1 to F6 fixed and the six-row audit record validated offline against the captured threads at this head

@josecelano

Copy link
Copy Markdown
Member

ACK 5f10e49

@josecelano
josecelano merged commit bcca976 into torrust:develop Nov 22, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants