Skip to content

chore(issues): archive closed issue #2801 spec to docs/issues/closed - #2819

Merged
josecelano merged 7 commits into
torrust:developfrom
josecelano-bot:2801-close-out
Nov 11, 2026
Merged

josecelano merged 7 commits into
torrust:developfrom
josecelano-bot:2801-close-out

Conversation

@josecelano-bot

@josecelano-bot josecelano-bot commented Nov 11, 2026 •

Copy link
Copy Markdown
Contributor

Close-out of #2801 (SI-19, roadmap row 19 of EPIC #1488). Related to #2801, which PR 2807 already closed. It contains documentation only.

  • Verified Remove legacy shutdown API and library OS signals #2801 is CLOSED on GitHub (closed by PR 2807, merged 2026-11-11 with torrust-server-lib 0.6.0).
  • Moved the spec from docs/issues/open/ to docs/issues/closed/ and set status: done, spec-path and last-updated-utc.
  • Ticked the workflow checkpoints and the acceptance rows that were waiting for the review and the close-out; recorded in the spec that no retrospective was needed and listed the follow-ups (the now-unused public error variants and the supervisor consolidation).
  • Repaired the live links: EPIC Overhaul: Tracker Shutdown #1488 row 19 (now Done), the migration guide, and the closed SI-23 and SI-24 specs. The historical review audits keep the paths they were written with.
  • Added the frontmatter block to the moved manual-verification-evidence.md.
  • Added two follow-up drafts, docs/issues/drafts/follow-up-si-19-remove-unused-error-variants/ and docs/issues/drafts/follow-up-si-19-consolidate-shutdown-supervisor/, and cited them in the spec's progress log.
  • Added the review audit docs/pr-reviews/pr-2819-review/PR-REVIEW.md.
  • linter all passes and the pre-commit hooks passed.

With this row Done, every roadmap row of EPIC #1488 is Done.

🤖 Generated with Claude Code

…ssues/closed

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
@josecelano josecelano self-assigned this Nov 11, 2026
@josecelano
josecelano requested review from da2ce7 and a balanced review from Copilot November 11, 2026 09:24
da2ce7
da2ce7 previously approved these changes Nov 11, 2026

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 46a540cdb7a10b4984413d0d2ebafa5d619aefd3. Recomputed from the bytes at this head, against the merge base ee069336a; git merge-tree against develop e3dfd7275 merges cleanly, and the merged tree differs from develop by exactly this PR's six paths.

Process: an archive move, governed by .github/skills/dev/planning/cleanup-completed-issues/SKILL.md, with open-pull-request and commit-changes for the PR and the commit. The folder moved whole; the spec carries status: done, the closed spec-path and a stamp at the commit minute; the checkpoints are ticked and the progress log records the move. Two items of Steps 3 to 5 are not done (F2, F3).

The change against its claim: each statement of the description holds at this head. The EPIC row 19 links the closed path and says Done, and every numbered roadmap row of the EPIC is now Done; the migration guide and the SI-23 and SI-24 specs point at the closed path. The added facts recompute: PR 2807 merged on 2026-11-11 with a closing keyword for the issue; the HTTP and REST Error::Stop, StartupNotification and StartupNotificationDropped and three UdpError variants (StartupNotification, Launcher, FailedToStartOrStopServer) have no use; the flaky health-check test is in the evidence (M5). One citation does not hold (F1).

Consistency: a tree-wide search for the folder name finds the old path only in the PR 2803 and PR 2807 review audits, which record the path of their time; every link and repository path on the changed lines resolves; the dictionary is unchanged.

Hygiene: one commit, 46a540cdb, with a Conventional subject and scope; author equals committer; one attribution footer naming a model, which no rule in the tree forbids; git diff --check is clean; the skill's PR-branch commit-id check prints nothing; the closing-keyword pattern matches neither the title, the description nor the commit.

Findings: F1 (Minor) the audit cited for the eight rounds records seven; F2 (Minor) four affected documents keep their old last-updated-utc; F3 (Minor) the moved evidence file has no frontmatter; F4 (Nit) [#2801] names an issue that is already closed; F5 (Nit) the closure preceded the completion-review record; F6 (Suggestion) the follow-ups have no tracking reference. None blocks.

Checked, no finding: the rewritten reviewer checkpoint (the spec already allowed the audit), the retrospective decision, the row 19 text, the frontmatter values against the validator's profile.

Checks

On the loop's compute node at this head, against the merge base ee069336a (receipt server-gates-kranich-673): the repository's pre-commit gate exit 0 (180 s), clippy-allow-reasons against the base exit 0, and the tree left clean; linter markdown, linter cspell, linter lychee (offline links) exit 0; this PR carries no audit record and has no review threads, so the audit validator does not apply. F1 read on the forge: PR 2807 has eight reviews by this account (seven dismissed, the approval 5849873024 at 5103f88dd), and its audit records rounds 1 to 7. git merge-tree against the current develop 8c24b0722 is also clean. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 8c24b0722.

@da2ce7

da2ce7 commented Nov 11, 2026

Copy link
Copy Markdown
Contributor

ACK 46a540c — the archive move, the closed-spec frontmatter, the EPIC row 19 and the repaired links match the bytes at this head, no live reference to the old path remains, and the merge into develop is conflict-free

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟡 Changes recommended

The archived evidence file lacks required metadata and parent-spec linkage, while several affected documents retain stale modification timestamps.

4 open issues
What changed in this PR

This documentation-only PR archives #2801 after the legacy shutdown API removal in PR #2807, completing the final planned roadmap row in shutdown EPIC #1488.

Changes:

  • Moves the issue specification and verification evidence into the closed-issue archive.
  • Records completed checkpoints, review evidence, and follow-up work.
  • Updates the EPIC roadmap and references to the archived specification.
File Description
docs/​issues/​open/​1488-overhaul-tracker-shutdown/​ISSUE.md Marks row 19 Done and links to the archived spec.
docs/​issues/​closed/​2801-1488-si-19-remove-legacy-shutdown-api/​manual-verification-evidence.md Preserves verification evidence in the archive.
docs/​issues/​closed/​2801-1488-si-19-remove-legacy-shutdown-api/​ISSUE.md Records completion, archival metadata, and follow-ups.
docs/​issues/​closed/​2450-1488-si-24-migrate-health-check-api-test-environment/​ISSUE.md Repairs the SI-24 reference to #2801.
docs/​issues/​closed/​2449-1488-si-23-migrate-rest-api-test-environment/​ISSUE.md Repairs the SI-23 reference to #2801.
docs/​features/​shutdown-process/​legacy-api-migration.md Updates metadata and body links to the archived spec.

Review effort: Balanced

Correct the audit citation, stamp the affected documents, add frontmatter to the
moved evidence, note the completion-review order, and track the follow-ups as drafts.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
@josecelano-bot josecelano-bot changed the title chore(issues): [#2801] archive the closed issue spec to docs/issues/closed chore(issues): archive closed issue #2801 spec to docs/issues/closed Nov 11, 2026
@josecelano
josecelano requested review from da2ce7 and a balanced review from Copilot November 11, 2026 09:48

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Warning

Copilot couldn't run its full agentic review because it didn't start before the timeout. Make sure your repository has a runner available, or add a copilot-code-review.yml file specifying one with the runs-on attribute. See the docs for more details.

Copilot review overview

No open issues 🎉

4 resolved since last review

Review effort: Lite

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 4a6e476d6d0ab860b57b7b046282e10210090c98. Recomputed from the bytes at this head, against the previous round's head 46a540cdb and the merge base ee069336a; git merge-tree against develop 8c24b0722 merges cleanly, and the merged tree differs from develop only in this PR's paths.

What moved: one commit, 4a6e476d6, fast-forwards 46a540cdb over eight paths; every other path is byte-identical, so the previous conclusions on them stand.

Previous findings: F1 fixed (lines 287 and 313 match the PR 2807 audit, which records the summary and rounds 1 to 7). F2 partly fixed: the four documents are restamped, but later than the commit (F10). F3 fixed (the template's block, issue-spec on the closed path). F4 partly fixed: the PR title drops [#2801]; both commit subjects keep it, which the reply declines. F5 fixed (the merge of PR 2807 is at 07:08:34 UTC). F6 fixed (two drafts, cited in the line 244 entry; their parent is F9).

The new commit: the six variants the draft names are defined in public enums and constructed nowhere at this head; the links and cited paths resolve.

Hygiene: Conventional subject and scope; the body matches the diff; author equals committer; one attribution footer, which no rule in the tree forbids; git diff --check is clean; the skill's PR-branch commit-id check prints nothing for the tree. One commit carries five fixes where step 6 of process-pr-review asks for one each; the PR 2807 audit took the same as no action, so no finding.

Findings: F7 (Minor) no audit record; F8 (Minor) replies cite the branch commit id; F9 (Minor) the drafts' parent EPIC; F10 (Minor) stamps postdate the commit; F11 (Nit) draft sections; F12 (Nit) a narrowed draft scope. None blocks on its own, but the audit validator cannot pass without the record, so this round comments.

Checked, no finding: the evidence frontmatter, the drafts' frontmatter against the strict issue profile, the F1 sweep.

Checks

On the loop's compute node at this head, against the merge base ee069336a (receipt server-gates-kranich-677): the repository's pre-commit gate exit 0 (72 s), clippy-allow-reasons against the base exit 0, and the tree left clean; linter markdown, linter cspell, linter lychee (offline links) exit 0; no audit record exists at this head, so the repository's audit validator was not run. F7 read on the forge: all 10 review threads are resolved, and docs/pr-reviews/pr-2819-review/PR-REVIEW.md does not exist at this head. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 8c24b0722.

josecelano-bot and others added 2 commits November 11, 2026 10:19
…ut PR

Restamp the affected documents at the first commit minute, give the follow-up
drafts unnumbered names and the full section set, and name the three parts of
the split-out supervisor work.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
@josecelano

Copy link
Copy Markdown
Member

ACK a9283a7

@josecelano
josecelano requested a review from da2ce7 November 11, 2026 10:32
da2ce7
da2ce7 previously approved these changes Nov 11, 2026

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at a9283a7938da56ec3cfdeeb69790790c82df623f. Recomputed from the bytes at this head, against the previous round's head 4a6e476d6 and the merge base ee069336a; git merge-tree against develop 55b44d48e merges cleanly, and the merged tree differs from develop by exactly this PR's nine paths, which develop has not touched since the base.

What moved: two commits, 2acee797e and a9283a793, fast-forward 4a6e476d6 over ten paths; every other path is byte-identical, so the previous conclusions on them stand.

Previous findings: F2 fixed with F10. F7 fixed: one audit row per thread (16), each source, reply, review ID and severity matching the forge, and the validator's logic, run offline, reports no failure. F8 fixed (the log maps 4a6e476d6 to its subject). F9 fixed (unnumbered folders, epic: null). F10 fixed (09:40 and 10:19, the minutes of the commits that write them). F11 fixed for the five sections it named (F14). F12 fixed. F4 stays partly fixed: the subjects keep [#2801], and the audit records it as fixed (F17).

The new commits: the draft paths and links resolve and no file names the old folders; the audit's verbatim sections match the template and its verification commands print what they claim.

Hygiene: Conventional subjects; author equals committer; one attribution footer each, which no rule in the tree forbids; git diff --check is clean; the commit-id check prints only 4a6e476d6, the id the audit maps as open-pull-request asks.

Findings: F13 (Minor) the drafts date their creation at 10:19; F14 (Nit) two Step 1 sections missing; F15 (Nit) the description omits the drafts; F16 (Minor) the round 2 log entry; F17 (Nit) the F4 entry. None blocks.

Checked, no finding: the R1 to R4 IDs (as in the PR 2803 audit, with the original IDs in the details); the EPIC's Step 0.7 search; the drafts' frontmatter; the merged tree's old-path mentions (an evidence command and three audits).

Checks

On the loop's compute node at this head, against the merge base ee069336a (receipt server-gates-kranich-685): the repository's pre-commit gate exit 0 (41 s), clippy-allow-reasons against the base exit 0, and the tree left clean; linter markdown, linter cspell, linter lychee (offline links) exit 0; the repository's audit validator on pr-2819-review exit 0 (16 rows, 3 log entries, no failures). F16 read at this head: git log -1 --format=%cI a9283a793 gives 10:25:05Z, and PR-REVIEW.md:279 is stamped 10:23. git merge-tree against the current develop f8b0f26e9 is also clean. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is f8b0f26e9.

@da2ce7

da2ce7 commented Nov 11, 2026

Copy link
Copy Markdown
Contributor

ACK a9283a7 — the archive, the follow-up drafts and the review audit match the bytes and the forge record at this head, the audit validator's logic passes offline, and the merge into develop 55b44d4 is conflict-free

…t PR

Date the drafts' creation at their first commit, and add the Architectural
Decisions and Verification Plan placeholders.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
@josecelano

Copy link
Copy Markdown
Member

ACK a9283a7

@josecelano

Copy link
Copy Markdown
Member

ACK 81d576f

@josecelano
josecelano requested a review from da2ce7 November 11, 2026 11:02
… audit

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
@josecelano

Copy link
Copy Markdown
Member

ACK feb0af1

…ings to the audit

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
@josecelano

Copy link
Copy Markdown
Member

ACK 224b391

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 224b391e0b3cee45957b2f7cda428bd14e2b1cbf. Recomputed from the bytes at this head, against the previous round's head a9283a793 and the merge base ee069336a; git merge-tree against develop f8b0f26e9 merges cleanly, and the merged tree differs from develop by exactly this PR's nine paths, which develop has not touched since the base.

What moved: three commits, 81d576fb8, feb0af1cb and 224b391e0, fast-forward a9283a793 over the two drafts and the audit; every other path is byte-identical, so the previous conclusions on them stand. The round-3 audit rows this round found missing at 81d576fb8 landed while it ran, so that finding is not posted.

Previous findings: F13 partly fixed: both drafts date their creation at 09:40, but the new entry dates the rename to 10:59 (F19). F14 fixed (the two placeholders complete the Step 1 list). F15 fixed (the description names the drafts, the evidence frontmatter and the audit). F16 fixed: the 11:03 correction names the commit time, the F7 reply and the timeout notice (F20). F17 fixed: the F4 entry restates both halves and records the declined one.

The new commits: the audit has one row per thread (21), each with its review, reply, severity and resolved state as on the forge; the 11:01, 11:03 and 11:07 entries match the reply times and the commits that carry them.

Hygiene: Conventional subjects that match their diffs (the audit commits have no body); author equals committer; one attribution footer each, which no rule in the tree forbids; git diff --check is clean; the commit-id check prints only 4a6e476d6, which the audit maps.

Findings: F19 (Minor) the 10:59 entries date the 10:19 rename; F20 (Minor) the correction leaves out the F8 reply; F21 (Nit) F16's verification pointer. None blocks.

Checked, no finding: the audit validator's logic, run offline (no failure, 21 rows, 6 log entries); the F4 restatement against the merge tool's title copy; the detail fields against the template.

Checks

On the loop's compute node at this head, against the merge base ee069336a (receipt server-gates-kranich-692): the repository's pre-commit gate exit 0 (53 s), clippy-allow-reasons against the base exit 0, and the tree left clean; linter markdown, linter cspell, linter lychee (offline links) exit 0; the repository's audit validator on pr-2819-review exit 0 (21 rows, 6 log entries, no failures). F19 read at this head: git log --follow -M30% on the first draft puts its rename in the commit made at 10:19:49Z, while line 64 dates it 10:59. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is f8b0f26e9.

### Progress Log

- 2026-11-11 09:40 UTC - AI agent (Claude Sonnet 5.5) - Draft created as a follow-up of SI-19; not yet a GitHub issue.
- 2026-11-11 10:59 UTC - AI agent (Claude Sonnet 5.5) - Renamed to an unnumbered folder with `epic: null` and added the Architectural Decisions, Verification Plan and the other initialization sections as placeholders.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F19] This entry dates the rename, epic: null and the sections F11 named to 10:59, but they landed at 10:19.

git log --follow -M30% shows both drafts renamed from their 2801-follow-up-* folders in docs(issues): [#2801] address the second review of the close-out PR, committed at 10:19:49, which also set epic: null and added Implementation Plan through Implementation Completion Review; docs(issues): [#2801] address the third review of the close-out PR (10:59:10) adds only Architectural Decisions and Verification Plan. The consolidation draft's line 64 says the same. process-pr-review takes an event's time from git log --format=%cI, as in F13, which asked for a 10:19 entry for the rename. Suggest a 10:19 entry for the rename and those sections, and a 10:59 entry for the two placeholders.

- 2026-11-11 10:07 UTC - Round 2 review of da2ce7 received (six findings, `F7` to `F12`); the Copilot review at 10:04 UTC reported no open issues.
- 2026-11-11 10:23 UTC - Round 2 replies posted after the fix commit `docs(issues): [#2801] address the second review of the close-out PR`, and this audit added in the commit that carries this entry.
- 2026-11-11 11:01 UTC - Round 3 review of da2ce7 received at 10:47 UTC (approval with five findings, `F13` to `F17`); replies for `F13` to `F15` posted between 11:01:13 and 11:01:19 UTC after the fix commit `docs(issues): [#2801] address the third review of the close-out PR`.
- 2026-11-11 11:03 UTC - Correction of the two round 2 entries above, as the log is append-only: the round 2 entry stamped 10:23 is carried by a commit made at 10:25:05 (its author time is 10:23:24); the `F7` reply (10:22:04) called the audit fixed before that commit existed, and the replies of `F9` to `F12` followed their fix commit; and the Copilot review at 10:04 UTC says its full agentic review did not start before the timeout.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F20] This correction leaves out the F8 reply, which also preceded the audit commit it describes.

The F8 reply (10:22:07) says "the audit maps the id 4a6e476d6 to its subject", but this file was added in docs(pr-reviews): [#2819] record the review rounds in the audit, committed at 10:25:05. The correction names the F7 reply and says the replies of F9 to F12 followed their fix commit, so the F8 reply is still covered only by the 10:23 entry's "replies posted after the fix commit". F16 named only the F7 reply, so the gap started in that finding. Suggest one appended entry that names the F8 reply as well, as the append-only rule asks.

- Source URL: https://github.com/torrust/torrust-tracker/pull/2819#discussion_r4536935111
- Concern: The round 2 log entry is stamped before its commit, and the F7 reply preceded the commit it names.
- Solution: An appended correction entry names the commit time, the F7 reply order and the Copilot timeout notice.
- Current-tree verification: The last Processing Log entry.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Nit][F21] F16's verification points at the last Processing Log entry, but the correction is the 11:03 entry; the last one is the 11:07 entry about the F16 and F17 replies.

This row and the 11:07 entry land in the same commit, docs(pr-reviews): [#2819] add the replies to the last two findings to the audit, so the pointer was off when written. Suggest naming the entry by its stamp (2026-11-11 11:03 UTC), which a later entry cannot move.

@da2ce7

da2ce7 commented Nov 11, 2026

Copy link
Copy Markdown
Contributor

ACK 224b391 — the audit's 21 rows match the forge threads, replies and commit times, its validator's logic passes offline, the drafts match their history save the F19 entry, and the merge into develop f8b0f26 is conflict-free

@josecelano

Copy link
Copy Markdown
Member

ACK 224b391

@josecelano
josecelano merged commit f2103c0 into torrust:develop Nov 11, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants