You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
L05-04 — Audit scheduler consumers and queue pressure #44
Reconcile existing PDFJobScheduler with CLI/batch priorities, budgets, cancellation, tracing, and backpressure.
Parent and boundary
Parent: #6. Owner: PdfTool. This issue owns one bounded slice of Production Orchestrator; consume accepted upstream contracts and keep PDF/verdict/publication authority with Core.
Acceptance
Foreground/operator work remains responsive under batch load; request identity fences results.
Failure case: A second scheduler or unbounded queue is rejected.
Required proof
Mixed-priority stress and cancellation fairness metrics. Record the exact source SHA, test command or hosted run, fixture/artifact identity, and any skipped or unavailable lane. Run the repository's mapped proof and check-change gate for a PR.
Handoff
Record changed files, observed result, remaining risk, and a 1–3 sentence anti-slop review. Completion means acceptance evidence, not merely a merged implementation.
Activity