feat(agents): improve workflow diagnostics and tool execution #33053
Triggered via pull request
September 25, 2026 05:50
Status
Failure
Total duration
5m 40s
Artifacts
–
ci.yml
on: pull_request
Detect Version
Detect Desktop Changes
0s
Prepare Trigger.dev
Matrix: Build AMD64
Matrix: Build Dev ECR
Matrix: Build ARM64 (GHCR Only)
Matrix: Test and Build / oauth-postgres
Matrix: Test and Build / test-shard
Test and Build
/
Lint and Test
3m 1s
Test and Build
/
Build App
2m 49s
Check Docs Changes
0s
Migrate Dev DB
/
Apply Database Migrations
Matrix: Create GHCR Manifests
Process Docs
/
Process Documentation Embeddings
Promote Trigger.dev
Prune Desktop Prereleases
Matrix: Attest Images
Desktop Release
/
Build, Sign, Notarize
Annotations
5 errors and 12 warnings
|
Test and Build / Build App
Process completed with exit code 1.
|
|
Test and Build / Build App
@sim/app#build: command (/home/runner/_work/sim/sim/apps/sim) /home/runner/.bun/bin/bun run build exited (1)
|
|
Test and Build / Lint and Test
Process completed with exit code 1.
|
|
Test and Build / PostgreSQL integration (migrate)
Process completed with exit code 1.
|
|
lib/knowledge/__integration__/member-document-lifecycle.integration.ts > member document lifecycle in PostgreSQL > finishes a pass within its page budget while listings re-stamp every observed document:
apps/sim/lib/knowledge/__integration__/member-document-lifecycle.integration.ts#L347
Error: Test timed out in 30000ms.
If this is a long-running test, pass a timeout value as the last argument or configure it globally with "testTimeout".
❯ lib/knowledge/__integration__/member-document-lifecycle.integration.ts:347:3
|
|
Test and Build / Build App
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Build App
- Step: unknown (failed)
|
|
Test and Build / Build App
Found 2 failed/cancelled steps in previous workflow steps
|
|
Test and Build / Build App
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Build App
- Step: unknown (failed)
|
|
Test and Build / Build App
Found 2 failed/cancelled steps in previous workflow steps
|
|
Test and Build / Build App
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / Build App
- Step: unknown (failed)
|
|
Test and Build / Build App
Found 2 failed/cancelled steps in previous workflow steps
|
|
Test and Build / PostgreSQL integration (migrate)
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / PostgreSQL integration (migrate)
- Step: unknown (failed)
|
|
Test and Build / PostgreSQL integration (migrate)
Found 2 failed/cancelled steps in previous workflow steps
|