Skip to content

DNM: test the stable lanes on 11.0.3 - #2987

Closed
ideaship wants to merge 1 commit into
mainfrom
dnm-test-11.0.3
Closed

ideaship wants to merge 1 commit into
mainfrom
dnm-test-11.0.3

Conversation

@ideaship

Copy link
Copy Markdown
Contributor

Do not merge. A comment-only change in .zuul.yaml, so that the label and label-additional pipelines run the stable lanes against the 11.0.3 pins now on main:

  • testbed-deploy-stable-in-a-nutshell-ubuntu-24.04 (11.0.3)
  • testbed-update-stable-ubuntu-24.04 (11.0.2 → 11.0.3)
  • testbed-upgrade-stable-ubuntu-24.04 (10.3.0 → 11.0.3)
  • testbed-update-stable-current-ubuntu-24.04 (11.0.3 → latest)

The stable-lane change itself was merged before its labelled jobs had finished:

Close without merging once the jobs have reported.

🤖 Generated with Claude Code

A comment-only change, so that the label pipelines run the stable
deploy, update and upgrade lanes against the 11.0.3 pins on main.
Not to be merged.

Assisted-by: Claude:claude-opus-5-5
Signed-off-by: Roger Luethi <luethi@osism.tech>
@ideaship ideaship added zuul-additional Release the dragons, run Zuul CI (additional) zuul Release the dragons, run Zuul CI and removed zuul-additional Release the dragons, run Zuul CI (additional) labels Nov 12, 2026
@ideaship

Copy link
Copy Markdown
Contributor Author

Test run done; closing without merging as intended. Results for OSISM 11.0.3:

  • testbed-deploy-stable-in-a-nutshell-ubuntu-24.04 (fresh 11.0.3): SUCCESS
  • testbed-update-stable-ubuntu-24.04 (11.0.2 → 11.0.3): SUCCESS on the second run. The first run failed in its 11.0.2 baseline, before the update: the cephadm bug worked around in 11.0.3 (cephadm: register osd.default before adding OSDs ansible-playbooks#585) left the OSDs of one host unencrypted.
  • testbed-upgrade-stable-ubuntu-24.04 (10.3.0 → 11.0.3): SUCCESS
  • testbed-update-stable-current-ubuntu-24.04 (11.0.3 → latest): SUCCESS

@ideaship ideaship closed this Nov 12, 2026
@ideaship
ideaship deleted the dnm-test-11.0.3 branch November 12, 2026 20:22
@github-project-automation github-project-automation Bot moved this from New to Done in Human Board Nov 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

zuul Release the dragons, run Zuul CI zuul-additional Release the dragons, run Zuul CI (additional)

Projects

Status: Done

Development

Successfully merging this pull request may close these issues.

1 participant