Repository navigation
Update dependency golang to v1.26.8 (main) - #3367
Open
red-hat-konflux[bot] wants to merge 1 commit into
Open
red-hat-konflux[bot] wants to merge 1 commit into
red-hat-konflux[bot] wants to merge 1 commit into
Red Hat Konflux / Red Hat Konflux / cli-main-on-pull-request
failed
Oct 8, 2026 in 22m 58s
Failed
Red Hat Konflux/cli-main-on-pull-request has failed.
Details
- Namespace: rhtap-contract-tenant
- PipelineRun: cli-main-on-pull-request-57l4c
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 4 seconds | |
| 🟢 Succeeded | 20 seconds | |
| 🟢 Succeeded | 2 minutes | |
| 🟢 Succeeded | 6 minutes | |
| 🟢 Succeeded | 37 seconds | |
| 🟢 Succeeded | 7 seconds | |
| 🔴 Failed | 5 minutes | |
| 🟢 Succeeded | 36 seconds | |
| 🟢 Succeeded | 14 seconds | |
| 🟢 Succeeded | 41 seconds | |
| 🟢 Succeeded | 19 seconds | |
| 🟢 Succeeded | 10 seconds | |
| 🟢 Succeeded | 12 seconds | |
| 🟢 Succeeded | 1 minute | |
| 🟢 Succeeded | 9 seconds | |
| 🟢 Succeeded | 3 minutes | |
| 🟢 Succeeded | 21 seconds |
Failure snippet:
task build-tekton-bundle has the status "PodCreationFailed":the step "build" in TaskRun "cli-main-on-pull-request-57l4c-build-tekton-bundle" failed to start. The pod errored with the message: "context deadline exceeded."
Loading