Skip to content

Prepare stable v1.1.0 and simplify V2 onboarding - #91

Merged
Lash-L merged 2 commits into
mainfrom
release/v1.1.0
Sep 18, 2026
Merged

Lash-L merged 2 commits into
mainfrom
release/v1.1.0

Conversation

@Lash-L

@Lash-L Lash-L commented Sep 18, 2026

Copy link
Copy Markdown
Contributor

Prepare 1.1.0 as the stable release of the V2 recovery and multipart NC changes. Remove the obsolete V2 unsupported status so guided pairing progresses through key recovery and completes after MQTT connects.

Remove the separate V2 research page and duplicate Beta testing instructions. V2 uses the normal onboarding flow; keep one practical note about recovery time and the sample counter. Update the confirmed-vacuum list and stable package/add-on versions. Retain Beta at 1.1.0-rc2, mark it currently unused, and document switching to stable without implying that add-on data transfers automatically.

Validation:

  • GitHub CI: 212 tests passed and the Linux amd64 Docker image built successfully.
  • Local: strict documentation build, source/wheel builds, lockfile check, and built-wheel version metadata passed.
  • Regression coverage verifies the admin API and V2 progression through region requests, recovered key, NC registration, and MQTT completion.

After merge, publish a non-prerelease v1.1.0 release to build the stable container image and aliases. The release has not been published.

@Lash-L
Lash-L marked this pull request as ready for review September 18, 2026 17:55
@Lash-L
Lash-L merged commit d109f42 into main Sep 18, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant