Skip to content

docs(hardware): the CRS326's adapter, its intake, and RouterOS 7 (#444) - #912

Merged
Gerrrt merged 5 commits into
mainfrom
gerrrt/homelab-issue-444-9da2aa
Oct 5, 2026
Merged

Gerrrt merged 5 commits into
mainfrom
gerrrt/homelab-issue-444-9da2aa

Conversation

@Gerrrt

@Gerrrt Gerrrt commented Oct 4, 2026 •

Copy link
Copy Markdown
Owner

The CRS326's 24HPOW was delivered on 2026-09-26. The repository still said it was in transit, and the roadmap still gave its arrival as the gate for Phase 1.

  • hardware.md: the adapter is recorded as delivered on 2026-09-26, and the intake line says the switch has not been powered on as of 2026-10-04.
  • roadmap.md: the gate is now Phase 1 at the bench, then the rack window.
  • swap-the-switch.md §1.2: notes the delivery, and points at the line in hardware.md that the intake facts replace.
  • changelog.md: a dated entry correcting the 2026-09-26 one. The older entry itself is unchanged.

Phase 1 intake, read at the bench on 2026-10-05:

  • hardware.md gets the switch's revision, serial and management MAC.
  • It arrived on RouterOS 6.48.6 and was upgraded to 7.23.7 long-term before the reset.
  • No SFP+ copper module is needed.
  • swap-the-switch.md §1.3 now starts with the upgrade, because its commands are written for v7 and this unit came on v6.

Docs only. No config or targets change. The switch swap itself is still the bench and the window, and #653 stays draft until after them.

Refs #444

🤖 Generated with Claude Code

The 24 V adapter the bench steps were waiting on was delivered on the
evening of 2026-09-26, the same day the changelog called it still in
transit. hardware.md, roadmap.md and swap-the-switch.md went on saying
that for eight days.

The roadmap's gate is now Phase 1 at the bench, which has not started,
then a rack window. The runbook's intake step pointed at an "in transit"
line that no longer exists, so it now names the line hardware.md keeps for
the intake facts. The changelog gets a dated correction rather than an
edit to the 2026-09-26 entry.

Refs #444

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Copilot AI balanced review requested due to automatic review settings October 4, 2026 23:49

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Copilot review overview

🟡 Changes recommended

The roadmap update includes historical and current-status details prohibited by that document’s stated scope.

Review effort: Balanced
Findings: 1 Low severity

Open (1)
What changed in this PR

Updates documentation to record the CRS326 power adapter’s delivery and remaining bench/rack gates.

Changes:

  • Records the 24HPOW delivery date and current intake status.
  • Updates the swap runbook, roadmap, and immutable changelog.
File Description
docs/​runbooks/​swap-the-switch.md Updates adapter intake guidance.
docs/​roadmap.md Revises the swap gate.
docs/​hardware.md Records delivery and power-on status.
docs/​changelog.md Adds a dated correction entry.

💡 Add a code-review agent skill or configure MCP servers for context-aware, tailored reviews. Learn more in the docs.

Comment thread docs/roadmap.md Outdated
Gerrrt and others added 2 commits October 4, 2026 23:54
The roadmap admits a link, the gate, the order and why, and no date that
is not a gate. The delivery dates and the not-started status belong to
hardware.md, the changelog and the issue, which already carry them.

Refs #444

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Phase 1 began at the bench. hardware.md gets what the runbook's intake
step asked for: revision r2, the serial, the management MAC, and the
RouterOS it arrived on (6.48.6, with MikroTik's default configuration). It
went to 6.49.22 and then to 7.23.7 long-term, with matching RouterBOOT
firmware, before the reset. 24 copper ports cover every copper port in
use on the MokerLink, so no SFP+ module is needed.

swap-the-switch.md §1.3 now says to upgrade to v7 first. Its commands
are written for v7, and this unit came on an end-of-life v6. The section
says how to do it with no internet at the bench, how to find which
version is long-term, and that reconnecting after the reset is by MAC in
WinBox.

Refs #444

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@Gerrrt Gerrrt changed the title docs(hardware): the CRS326's 24HPOW was delivered 2026-09-26 (#444) docs(hardware): the CRS326's adapter, its intake, and RouterOS 7 (#444) Oct 5, 2026
Gerrrt and others added 2 commits October 5, 2026 01:55
… over HTTPS (#444)

At the bench, the HTTPS login page loaded without a warning and WebFig
then sat on Connecting, while plain http worked. RouterOS 7.23 enables a
reverse-proxy service on 443 beside www-ssl. Disabling it fixed it. Step
1.4 now disables it, with ftp, telnet, api and api-ssl, which a reset to
no defaults also leaves on. It also says to set the clock by hand, because
on the bench the switch has nothing to take time from.

Refs #444

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
What the CRS326 was given at the bench: the identity, TLS from the estate
CA, the services left on, one SNMPv3 user and no v2c, and the bridge built
from the wiki's port map. VLAN 1 holds only the bridge and port 1, so an
access port can no longer reach the switch's management, which the
MokerLink allowed. The SNMP proof needs the switch racked, so it moves to
Phase 2.

Refs #444

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@Gerrrt
Gerrrt merged commit 7350011 into main Oct 5, 2026
8 checks passed
@Gerrrt
Gerrrt deleted the gerrrt/homelab-issue-444-9da2aa branch October 5, 2026 04:47
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants