docs(hardware): the CRS326's adapter, its intake, and RouterOS 7 (#444) - #912
Merged
Merged
Conversation
The 24 V adapter the bench steps were waiting on was delivered on the evening of 2026-09-26, the same day the changelog called it still in transit. hardware.md, roadmap.md and swap-the-switch.md went on saying that for eight days. The roadmap's gate is now Phase 1 at the bench, which has not started, then a rack window. The runbook's intake step pointed at an "in transit" line that no longer exists, so it now names the line hardware.md keeps for the intake facts. The changelog gets a dated correction rather than an edit to the 2026-09-26 entry. Refs #444 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
There was a problem hiding this comment.
Copilot review overview
🟡 Changes recommended
The roadmap update includes historical and current-status details prohibited by that document’s stated scope.
Review effort: Balanced
Findings: 1
Open (1)
What changed in this PR
Updates documentation to record the CRS326 power adapter’s delivery and remaining bench/rack gates.
Changes:
- Records the 24HPOW delivery date and current intake status.
- Updates the swap runbook, roadmap, and immutable changelog.
| File | Description |
|---|---|
docs/runbooks/swap-the-switch.md |
Updates adapter intake guidance. |
docs/roadmap.md |
Revises the swap gate. |
docs/hardware.md |
Records delivery and power-on status. |
docs/changelog.md |
Adds a dated correction entry. |
💡 Add a code-review agent skill or configure MCP servers for context-aware, tailored reviews. Learn more in the docs.
The roadmap admits a link, the gate, the order and why, and no date that is not a gate. The delivery dates and the not-started status belong to hardware.md, the changelog and the issue, which already carry them. Refs #444 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Phase 1 began at the bench. hardware.md gets what the runbook's intake step asked for: revision r2, the serial, the management MAC, and the RouterOS it arrived on (6.48.6, with MikroTik's default configuration). It went to 6.49.22 and then to 7.23.7 long-term, with matching RouterBOOT firmware, before the reset. 24 copper ports cover every copper port in use on the MokerLink, so no SFP+ module is needed. swap-the-switch.md §1.3 now says to upgrade to v7 first. Its commands are written for v7, and this unit came on an end-of-life v6. The section says how to do it with no internet at the bench, how to find which version is long-term, and that reconnecting after the reset is by MAC in WinBox. Refs #444 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
… over HTTPS (#444) At the bench, the HTTPS login page loaded without a warning and WebFig then sat on Connecting, while plain http worked. RouterOS 7.23 enables a reverse-proxy service on 443 beside www-ssl. Disabling it fixed it. Step 1.4 now disables it, with ftp, telnet, api and api-ssl, which a reset to no defaults also leaves on. It also says to set the clock by hand, because on the bench the switch has nothing to take time from. Refs #444 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
What the CRS326 was given at the bench: the identity, TLS from the estate CA, the services left on, one SNMPv3 user and no v2c, and the bridge built from the wiki's port map. VLAN 1 holds only the bridge and port 1, so an access port can no longer reach the switch's management, which the MokerLink allowed. The SNMP proof needs the switch racked, so it moves to Phase 2. Refs #444 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.

The CRS326's 24HPOW was delivered on 2026-09-26. The repository still said it was in transit, and the roadmap still gave its arrival as the gate for Phase 1.
hardware.md: the adapter is recorded as delivered on 2026-09-26, and the intake line says the switch has not been powered on as of 2026-10-04.roadmap.md: the gate is now Phase 1 at the bench, then the rack window.swap-the-switch.md§1.2: notes the delivery, and points at the line inhardware.mdthat the intake facts replace.changelog.md: a dated entry correcting the 2026-09-26 one. The older entry itself is unchanged.Phase 1 intake, read at the bench on 2026-10-05:
hardware.mdgets the switch's revision, serial and management MAC.swap-the-switch.md§1.3 now starts with the upgrade, because its commands are written for v7 and this unit came on v6.Docs only. No config or targets change. The switch swap itself is still the bench and the window, and #653 stays draft until after them.
Refs #444
🤖 Generated with Claude Code